Refinery cooling-water corrosion-inhibitor program
Programme outline, dosing range, feed points, target parameters, and lead times for the AAS corrosion-inhibitor program into the refineries segment in Pakistan. Sole Pakistan agent for Shaanxi Ande Technology (China) and Innovative Water Technology (Pakistan). Karachi office, same-business-day technical response.
Same-day Karachi visit · CoA per drum · Engineering autopsy on request
PRL's Euro-5 deep-conversion upgrade and ARL / Cnergyico parallel upgrades are writing new utilities-chemistry scopes in 2026. Corrosion-inhibitor packages are typically the first chemistry line to ship at commissioning.
Dosing programme outline
Programme outline below is the AAS default for refineries applications. Final dose is set against the customer's source-water analysis, equipment metallurgy, and operating cycles. Every drum ships with a Certificate of Analysis; SDS is shipped pre-shipment for HSE-document review.
- Active chemistry
- HEDP / ATMP phosphonate + zinc + tolyltriazole
- Feed point
- Continuous slug to cooling-tower basin
- Target pH
- 7.5–8.6
- Target Ca hardness
- ≤ 800 ppm as CaCO₃
- Cycles target
- 4.5–6.0
- Cu / brass protection
- Tolyltriazole 0.5–1.5 ppm
- Mild-steel target
- ≤ 3 mpy on D2776 coupon
- Compatibility
- Free chlorine ≤ 0.5 ppm, bromide-stable
- Lead time
- Ex-Karachi stock; 4–6 wks direct-import on bulk
Why a refinery cooling loop kills cheap inhibitor programs
Refinery cooling water sees the worst combination in Pakistani industry: hot process side (90–110 °C skin temperature on overhead condensers and pump-seal coolers), aggressive makeup chemistry from KW&SB blends, intermittent hypochlorite shocks for legionella control, and brass / admiralty tubes in older condenser bundles. A flat HEDP-only inhibitor fails on two of those failure modes simultaneously — phosphate reversion under shock-load, and de-zincification of yellow-metal tubes when zinc is dosed low. AAS programs sit on a phosphonate-zinc-azole balance specifically tuned against PRL / PARCO / ARL feedwater profiles.
Read deeper into the programme.
Request a technical proposal for corrosion-inhibitor program.