Home · For Power Plants · Cooling-Tower Treatment Program
Power plants · Cooling tower · Antiscalant + corrosion inhibitor + biocide rotation

Cooling-tower treatment program for thermal IPPs

Programme outline, dosing range, feed points, target parameters, and lead times for the AAS cooling-tower treatment program into the power plants segment in Pakistan. Sole Pakistan agent for Shaanxi Ande Technology (China) and Innovative Water Technology (Pakistan). Karachi office, same-business-day technical response.

Same-day Karachi visit · CoA per drum · Engineering autopsy on request

Field note Power Plants · Cooling-Tower Treatment Program

AAS took a 12,000 m³/h Karachi power-utility tower from 3.2 to 5.1 cycles on the AD-401 / AD-303 programme, with 22 months on dose and no scale-driven outage.

Programme spec

Dosing programme outline

Programme outline below is the AAS default for power plants applications. Final dose is set against the customer's source-water analysis, equipment metallurgy, and operating cycles. Every drum ships with a Certificate of Analysis; SDS is shipped pre-shipment for HSE-document review.

Antiscalant
AD-401 phosphonate-polymeric blend, 4–8 ppm on makeup
Corrosion inhibitor
Phosphonate + zinc + tolyltriazole, slug-fed
Oxidising biocide
Sodium hypochlorite continuous to 0.2–0.5 ppm free residual
Non-oxidising biocide
UN-611 weekly shot, 50–100 ppm, 4–6 hr contact
Target cycles
4–6, sized against makeup TDS and LSI
Target mild-steel corrosion
≤ 3 mpy on D2776 coupon
Yellow-metal protection
Tolyltriazole 1–2 ppm
Dispersant load
Polyacrylate / polymaleic 5–15 ppm on cycles ≥ 5
Lead time
Ex-Karachi stock on AD-401, AD-303, UN-611
Why this matters in power plants

Why IPP cooling towers run their chemistry harder than refineries do

Thermal IPP cooling towers — combined-cycle gas, RFO-fired, coal — run higher cycles of concentration than refinery towers because the makeup-water cost line is on the operator's P&L, not on the parent's. A K-Electric CCPP cooling tower pushing 5.5 cycles on KW&SB-blend makeup will scale CaCO₃ aggressively if the antiscalant and dispersant pair are not matched against the makeup-water LSI. AAS programs are sized cycle-by-cycle, with the AD-401 antiscalant dose and AD-303 corrosion-inhibitor balance set against a current makeup-water analysis — not a generic recipe.

Procurement & engineering enquiry

Request a technical proposal for cooling-tower treatment program.

Send the unit you're trying to protect (site, loop or train, symptom or KPI, volume, deadline) plus a source-water analysis if you have one. Same-business-day Karachi reply with a programme outline, dose range, and the relevant CoAs / SDS attached.

Karachi office · Sole Pakistan agent · Shaanxi Ande & Innovative Water

Request proposal WhatsApp