Home · For Power Plants · Boiler-Water Treatment
Power plants · HRSG / utility boilers · Oxygen scavenger + amine + phosphate

Boiler-water treatment chemistry for thermal IPPs

Programme outline, dosing range, feed points, target parameters, and lead times for the AAS boiler-water treatment into the power plants segment in Pakistan. Sole Pakistan agent for Shaanxi Ande Technology (China) and Innovative Water Technology (Pakistan). Karachi office, same-business-day technical response.

Same-day Karachi visit · CoA per drum · Engineering autopsy on request

Field note Power Plants · Boiler-Water Treatment

AAS supplies legacy hydrazine and modern carbohydrazide / DEHA scavengers — the call is the customer's OEM specification and EHS posture, not a one-size programme.

Programme spec

Dosing programme outline

Programme outline below is the AAS default for power plants applications. Final dose is set against the customer's source-water analysis, equipment metallurgy, and operating cycles. Every drum ships with a Certificate of Analysis; SDS is shipped pre-shipment for HSE-document review.

Oxygen scavenger
Carbohydrazide / DEHA, dosed pre-economiser
Target dissolved O₂
< 7 ppb at economiser inlet
Neutralising amine
Cyclohexylamine + morpholine blend
Target condensate pH
8.8–9.3 (carbon steel) or 9.2–9.6 (mixed metallurgy)
Internal-treatment programme
Co-ordinated phosphate / polymer for drum boilers
Target boiler-water Na/PO₄
Per ASME / EPRI guidelines for the operating pressure
Blowdown set against TDS limit
Per IBR class / OEM specification
Compatibility
All major drum-boiler / HRSG OEMs
Lead time
Ex-Karachi stock on scavenger and amine
Why this matters in power plants

Why IPP boilers fail on the wrong scavenger / amine pair

Modern HRSG and utility-boiler chemistry is set by the OEM (Mitsubishi, Siemens, GE, BHEL) against the operating pressure of the boiler. A 1,200 psig drum requires a different oxygen-scavenger and internal-treatment discipline than a 600 psig auxiliary boiler. Two failure modes show up in Pakistani IPP practice: hydrazine carried over into condensate (ammonia formation, copper-alloy attack), and under-dosed amine in long condensate networks (carbonic-acid pitting at distant returns). AAS sizes scavenger and amine programs against the boiler OEM specification and the customer's condensate-network geometry.

Procurement & engineering enquiry

Request a technical proposal for boiler-water treatment.